An engine – driven generator is used for secondary power on fire alarm systems. Of the responses below which are requirements for the battery and charger for the generator select all that apply.
A . Separate battery.
B. Automatic charger.
C. Explosion proof charger.
D. Weatherproof battery.
A
B
C
EMT must be securely fastened at least _ ft from a box or terminal
A.2
B.3
C.6
D.10
B.3
You will achieve the highest chances of test success by learning and understanding, fire tech training, material rather than attempting to memorize sample quiz questions
A. True
B.False
A.True
All communication and transmission channels between the proprieties of supervising station and a protected premises control unit shall be operated manually or automatically at least
A. Once per shift.
B. Every 12 hours.
C. Every hour.
D. Every 24 hours.
D. Every 24 hours.
The perimeter of canopies, loading docks and other open wall structures as indicated on drawings by
A. Single lines.
B. Double line.
C. solid lines
D. Broken lines.
D. Broken lines
The main purpose of elevator recall is to disable the elevators and force occupants to use the stairways
A. True.
B . False
B. false. 
It is important to know what the system sequence of events should be known when the system is not operating as it should
A. True.
B. False.
A.True
Preliminary drawings led to working drawings which detail finished
A. True.
B. False.
A. True.
The travel distance from any point a protected area to the nearest fire extinguisher shall not exceed/FT
A. 50.
B. 75.
C. 100.
D. 200.
C. 100
You should take some time to write notes to yourself to keep track of any special condition or special requirements for an area required heat/smoke detectors
A. True.
B. False.
A.True
Detailed drawings, including, which of the following?
A. Land CONTOURS.
B. All non-– load bearing details of structure.
C. Plumbing system.
D. Fire alarm control panel location.
B. All non-loaded bearing details of structure.
A heat detector in an elevator hoistway must have a setting - the operating point of a sprinkler head
A. Higher than.
B. Lower than.
C. The same as.
B. Lower than.
What section of the NFPA 72 defines requirements for the minimum secondary power supply capacity for Central Station service alarm systems, and equipment?
A. Section 26.3.4.7.
B. Section 10.6.7.2.5.
C. Section 10.4.2.1.
D. Section 26.6.4.3.
B. Section 10.6.7.2.5.
When there are multiple autonomous control units controlling the same-only one shall be in control at any given time
A. Singling line circuit.
B. Class N network system.
C. initiating device circuit.
D. Notification of appliance network.
C. initiating device circuit.
After locating a space spot type smoke detector within 36 inches of the top of the slope in an area with a shed type slope ceiling you must the space any additional smoke detectors by measuring up the slope of the ceiling to ensure a code compliant installation.
A. True.
B. False.
B. False.
A signal from a carbon monoxide alarm is permitted to have priority over a fire alarm signal
A. True
B. False.
B. False.
Protective gloves are worn
A. To ensure avoidance of any hand injury.
B. When working with metal stampings where there are sharp edges or splinters involved
C. When dealing with elevated temperatures of materials or equipment
D. To keep your hands clean.
All
A non-required system has been requested by a building owner since the system is not required by local court or ordinance. It is not required to meet the same requirements as required protective premises parlor system.
A. True.
B. False.
B.false
When the contract needs clarification, correction or change, this is called a
A. Allowance.
B. Addendum
C. Alternate
D. Cost plus format.
E. Fix free format.
B. Addendum.
Based on elevation drawing above, what is the average height of the slope? 12ft 40ft18ft [_/
A. 18 feet.
B. 12 feet.
C. 40 feet.
D. 15 feet.
D. 15 feet
What drawings would be used to locate a smoke detector by the fire protection engineer in an area?
A. Mechanical drawings
B. Riser drawings.
C. Elevation drawings
D. Reflect the ceiling plans.
D. Reflected ceiling plans.
Control unit diagrams shall include, which of the following information
A. All indicators and manual control.
B. Identification of control equipment depicted.
C. All circuits connected to wiring terminals.
D. Field connections to an elevator shop trip circuit.
All
What information about the layout should know or research prior to starting heat detector layout (select all all that apply )
A. Location of domestic water main
B. Expected ambient temperature for the area.
C. Building electrical load calculations.
D. Expecting maximum ceiling temperature.
E. Location of instructions on the ceiling.
F. Location of movable walls if any 
B D E F
The owner of a building wants to have a sprinkler system installed in a new addition he has asked the general contractor to include the sprinkler contractor in his contract. The sprinkler contractor will become.-contractor to the general contractor
A. Prime.
B. Sub.
C. Main.
D. Second tier.
B. Sub.