In a 2013 study by the University of South Australia, what was found to the optimum level of SE effort?
A normalized range of 10% to 14% of the total project cost.
From the 1993 study by the Defense Acquisition University (DAU), what was found about the relationship between actual costs accrued and LCC cost committed?
By the time 20% of the actual costs have been accrued, 0% of the total LCC cost had already been committed.