what is full capacity?
means that all the resources available to the firm are being used to the fullest extent all of the time
what is spare capacity
means that for some of the time some resources are not being used and therefore there is a loss of potential output
what is capacity utilisation
measures what proportion or percentage of the theoretical maximum possible output is actually produced.
formula for capacity utilisation
current output / maximum possible output x 100
what is under-utilisation of capacity?
means the capital equipment is lying idle some of the time; it means that productivity is lower than it could be
implications of under-utilisation of capacity?
what is over-utilisation of capacity?
means that the business is trying to produce more than its capital equipment was designed for
implications of over-utilisation of capacity?
ways to reduce under-utilisation?
ways to reduce over-utilisation?