298 Programmable Logic Controllers Flashcards

(35 cards)

1
Q

The time it takes a programmable controller to run through its program and return to the beginning is called ______ time

A

Scan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The logical decisions of a programmable controller are made in the

A

processor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which of the following PLC elements give the system flexibility?

A

Program

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The binary system is based on the number______ The hexadecimal system commonly used with PLCs is based on the number______

A

2; 16

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The code most often used to represent alphanumerics

A

ASCII

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The Boolean NOT function acts as an)

A

inverter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Ladder logic differs from most other computer languages in that it is

A

drawn graphically

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Which digit is the most significant in the number 2684?

A

2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

In the binary system, each bit has a weight of _____ times the digit to the right of it.

A

TWO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Although an output generally appears on only one rung of a ladder logic program, it may be energized by several sets of conditions that appear as

A

branches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When a ladder logic program is written as part of a larger program an) ____ is used to tell it when to start its sequence

A

handshaking signal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Boolean logic is written in _____ form

A

Listing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

most PLC applications, each pushbutton contact is wired to an)

A

input terminal on an input module

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The function of a float switch is to indicate

A

Liquid level

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

To be useful to a PLC, analog input signals must be ____ by an input module

A

Digitized

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The temperature range a thermocouple can detect is determined by the

A

combination of metals used

17
Q

The number of TTL output devices a TTL output module can drive is called

18
Q

Working with accurate, thorough specifications ensures that

A

all efforts move toward a common target

19
Q

When sizing a programmable controller system, you must consider I/O, memory, and

20
Q

The first step in developing a PLC system to meet given specitications Is

A

sizing the system

21
Q

Before turning a newly designed and installed system over to production, use the output disable function and indicating lights to check for correct

22
Q

The easiest way to develop a PLC program is usually to divide the logic into different

23
Q

Which hardware documentation drawing identifies all system components and wiring termination points?

24
Q

A bill of material should include a complete list of part numbers, device numbers cross-referenced in the drawing, and part

A

Manufacturers

25
Which of the following documents walks you through the complete PLC system operation?
Sequence of operation
26
The most important tool a maintenance technician can possess is an
Documentation package
27
Information concerning parts replacements, adjustments, and other system changes can be found in the
maintenance log
28
When control components fail, the problem is most often related to
Dirt
29
As a good general rule, you should replace the battery in a programmable controller
Annually
30
Which documentation shows how all field devices are wired and connected to the controller?
Schematic diagram
31
Which of the following is the most common cause of a program problem?
Changes made to the original program
32
Which of the following is a recommended test strategy for troubleshooting?
Start at the switch and test each connection until you reach the controller
33
The process of relating software addresses to the physical locations of remote 1/0 points is called _____ the system
Configuring
34
A LAN application in which information stored in different drops is collected at a central location is known as
data acquisition
35
Adding I/O points in an existing rack is called
local expansion