9.1. An access work plan shall be completed prior to beginning all rope access work.
9.2. The access work plan shall be maintained at the worksite and available to all affected persons.
9.3. The access work plan shall be updated as necessary during the course of rose access work.
9.4. A documented review of the access work plan by rope access technicians shall be conducted prior to each work shift and after any updates.
9.5. The access work plan should be reviewed by any person affected by the rope access work.
9.6. For new work, a site survey should be conducted to help determine:
9.6.1. The nature of the work environment.
9.6.2. Feasibility of the means of access.
9.6.3. Foreseeable hazards to rope access technicians and others.
9.7. The access work plan shall, at a minimum, consist of the following:
9.7.1. Work method.
9.7.2. Risk assessment.
9.7.3. Special permits
9.7.4. Rescue plan.
9.8. Work Method
9.8.1. The work method, shall, at a minimum, provide:
9.8.1.1. Members of the work team by name and identify their roles and level of training.
9.8.1.2. The hazard and fall zones is accordance with Section 10.
9.8.1.3. The communication plan in accordance with Section 11.
9.8.1.4. Required rope access systems in accordance with Section 12.
9.8.1.5. Required rope access equipment in accordance with Section 13.
9.8.1.6. Required tools and other materials in accordance with Section 14.
9.Access Work Plan
9.8.1.7. Required personal protective equipment(PPE).
9.9. Risk Assessment