What are the four sections of the NZIA AAS?
A Contract
B Scope of Services
C Fees
D General Conditions
Name three fee-charging options
Lump Sum Fee Basis
Time Charge Fee Basis
Percentage Fee Basis
What is the CIC
Construction Industry Council
The Contract Works achieve Practical Completion when:
How much insurance is required in AAS?
Standard in AAS is PI “not less than” $250,000
PL “not less than” $1M
If a greater amount is required by the client, the cost of the additional amount will be at the client’s expense.
Things to consider if setting up a project specific agreement with another architect?
What is a Novated Contract?
Novation means replacing one party to the agreement (the client) with another party (the builder).
The aim of these agreements is to provide less risk to the financier - banks. It is a form of design-build contract where the client has greater involvement in the early stages of design.
What is a Joint Venture, what are some advantages and disadvantages?
A formal business agreement entered into by two or more forms for one ore more specific projects.
Advantages; greater opportunities, client reassurance and convenience, extension of geographical area reached, combining resources.
Disadvantages; time and cost to establish, legal and insurance requirements, liability risk, who is entitled to the glory?
Why do Limited Services increase the architects exposure to litigation, and the clients risk?
A saying to remember for selecting a client
It is as important for the architect to select a client as it is for the client to select an architect.
NZIA Practice note has some guidance on things to think about for this.
What must you do before starting work?
Obtain a written agreement.
Under the NZRAB Code of Minimum Standards of Ethical Conduct a registered architect must not undertake professional work unless the registered architect and the client have agreed to the terms of the appointment.
Name six reasons you may wish to resign from an architectural commission:
Responsibilities to remember if you wish to resign from an architectural commission:
What is a Fast Track Project?
Design and Construction activities overlap rather than proceeding sequentially, which allows construction to commence before all design or documentation is completed.
What are some things to consider in tenancy works?
Common causes of complaints against architects?
Failure to meet client expectations
Poor communication
Poor technical performance
What is required for effective communication with your client?
How to meet client expectations?
What to do if engaged for earthquake remediation works?
Read NZIA Practice Note and take lots of photos
What to do if asked to be an expert witness?
Consider if you are an expert?
Read the NZIA practice note
Define Observation
Visiting the site at times/dates entirely at the architect’s discretion to observe that the contract works are generally being built in accordance with the contract documents.
What to do if you notice the works are not being built in accordance with the contract documents?
Report in writing to the client and contractor and to the person that has the role of administering the contract.
What should you do if the client wants to negotiate a cheaper fee for site visits for observation - e.g. fortnightly or monthly?
Advise, in writing, that you will not carry out any observation nor will you issue a practical completion certificate.
When should you use the NZIA SMALL Projects AAS?
When fees are less than $5k