AOP-2 entry conditions
Symptoms of excessive load (PZR pressure/level lowering, audible noise) in conjunction with any of the following:
AOP-2 automatic actions
NONE
AOP-2 reactor trip criteria
AOP-2 turbine trip criteria
Reactor power less than 15% AND Turbine Governor Valve Control in manual and not controlling
AOP-2 immediate actions
NONE