What are the weather requirements for a circle to land approach
* Charted circle to land minimums, whichever is higher
When should pilots listen to CTAF and make position reports at an uncontrolled airport?
* Position reports no less than 10 miles out
When must the aircraft be stabilized by on an approach?
1,000 ft HAT
How are ILS PRM breakouts to be flown?
Hand flown
Before being dispatched to an airport with visibility less than 3/4 mile there must be what percentage of additional runway length needed?
15% extra