Wearing Ba
• Can have just one wearer if;
1/ they do not enter a structure.
2/ they are in view of nominated person
•EDBA only used for re entry or 2nd wear in exceptional circumstances
Comms
Minimum Briefing Info
Cable entanglement
IC or SC
1/ consider declaring FF emergency
2/ consider isolating electrical supplies
3/ commence accident investigation
Guidelines
Bridgehead or forward BA entry control point must be sited in safe air with regard to following factors
1/ potential for incident to escalate
2/ availability of access and egress points
3/ BA team safety/welfare
4/ Availability of water supply
5/ Effective comms
6/ Level of supervision/ support needed for ECO
7/distance from access point to ECP
Gastight
If out of site Stage 2 ECP.
Aerial and ladders
• if working from head
- ECB state location of wearer and that working alone.
Working with other agencies
If other agencies wearing BA then LFB manage BA control procedures.
Only LAS HART may be committed through LFB ECB. All other agencies must supply their own board.
Manual calculation only used when
* ECB fails and no replacement avail. Clock must be working.
BA Sector
PRO/ PRC
IC or SC make arrangement to record and store all brief/ debrief
RPELO
Yellow surcoat