Open Hole Completion
Leave the entire drilled reservoir open. Low cost.§
Screen or pre-slotted liner completion
A wire wrapped screen, or similar is installed. Prevents sand production in wellbore.
Cemented and perforated casing.
Install a cemented casing string. perforated allows paths for fluid to flow from and to wellbore.