Boilers and engines of 9 - 250 HP in the aggregate require what type of attendance, Which section of chapter 146 is referenced
MGL CHAPTER 146, SEC 46
Periodic attendance,
- Licensed engineer shall perform daily maintenance as required , and shall remain in the same building as the operating boiler
- boiler must be equipped with automatic shutdown devices
- safe operation of the boiler shall be the primary duty of the operator
- operator shall retain full discretion to return to the boiler room for monitoring purposes and such visits will be recorded in the departments log book
Boilers and engines of 251 - 500 HP in the aggregate require what type of attendance. Which section is referenced
MGL CHAPTER 146, SEC 46
Non continuous attendance, In addition to the requirements of periodic attendance, a remote monitoring station shall be in place that has the ability to shut down the boiler and the boiler shall be inspected by the operator beween 4 and 6 times per shift
When does a boiler need two means of supplying feedwater
A boiler with over 500 sq ft of heating surface that cannot have the heat input shut off must have 2 means of supplying water to the boiler
What is the minimum pipe size to a water column
Minimum pipe size = 1’’
What information is on a Certificate of Inspection
1- name of owner/user,
2- location, size and number of boilers,
3 - date of inspection, signature of Inspector and MAWP
- Referenced in chapter 146, section 27
Who can appeal the results of a license exam
A person aggrieved by the action of a single examiner
Why would your license be suspended or revoked
Incompetence or untrustworthiness
What information is on the operators log book. Chapter reference
Chapter 146, section 46A date, time, continuous blowdown setting gauge glass blowdown, low water cutoff tested, safety valve manually tested, operator notes, operators signature and license number. name of the place, address, type of boiler (#), pressure allowed (PSI), safety valve set at PSI & lbs/hr, the date (month and year)
Periodic attendance is required for boilers with. Chapter reference
Chapter 146, section 46
9 – 250 boiler horsepower
How do we know a boiler has been inspected
The boiler has a valid certificate of inspection posted
A license is required to operate boilers > 15 psi. At which horsepower is a license required
Boilers more than 9 boiler horsepower
Of the various codes that are used in a boiler design, which is the most widely used? What is the purpose of the code
ASME boiler and pressure vessel code
gives guidelines and requirements to boiler design
ensures life; equipment and property are safely protected
Taking over a shift, first thing to check is
Log book or water level in operating boiler(s)
Annual inspection; extension of time; first inspection, Chapter reference
Section 6. Inspections
Persons authorized to inspect boilers. Which chapter of 146 is referenced
Chapter 146, Section 13. Persons authorized to inspect boilers
Classes of licenses and work permitted; license renewal; continuing education. Which section of chapter 146 is referenced
Section 49. Classes of licenses
license testing requirements, Which section of chapter of 146 is referenced
To be eligible for examination for a third class engineer’s license, must furnish evidence as to his previous training and experience and must have been employed in a boiler or steam power plant as a steam engineer, fireman, control room operator, water tender, auxiliary operator or engineer’s assistant for not less than one and one half years, or must have held and used a first class fireman’s license for not less than one year. Section 50
Display of license; daily record of boiler, condition and repairs; filing; accessibility, which section of chapter of 146 is referenced
Section 51. An engineer’s or fireman’s license shall be so placed in the engine or boiler room of the plant operated by the licensee as to be easily read.
Licenses; duration; fees; expiration; renewal; revocation. Which section of chapter of 146 is referenced
Section 67. A license shall continue in force until the date of birth of the licensee occurring more than twelve months but not more than twenty-four months after the effective date of such license unless suspended or revoked for incompetence or untrustworthiness of the licensee, except that a special license shall not continue in force after the holder thereof ceases to be employed in the plant specified in the license. If any such license or the renewal thereof expires in an even year, any subsequent renewal shall expire on the next anniversary of the licensee’s date of birth occurring in an even year. If any such license or renewal thereof expires in an odd year, any subsequent renewal shall expire on the next anniversary of the licensee’s date of birth occurring in an odd year. A license issued to a person born on February twenty-ninth shall, for the purposes of this section, expire on March first. The fee for the renewal of a license shall be determined annually by the commissioner of administration under the provision of section three B of chapter seven for the filing thereof; provided, however, that in no case shall the fee for the renewal of a license to operate hoisting machinery be less than sixty dollars, and in no case shall the fee for a new license to operate hoisting machinery be less than seventy-five dollars. Licenses not renewed at expiration date shall become void, and shall after one year be reinstated only by re-examination of the licensee; provided, however, that if the licensee is on active duty with the armed forces of the United States, the license shall remain valid until the licensee is released from active duty and for a period of not less than 90 days following that release. A notice of the date of expiration of a license shall, at least thirty days prior to such date, be sent to the licensee. The inspector of the division for the town where a licensee resides may issue a renewal license. A person whose license is suspended or revoked shall surrender his license to the chief or an inspector of the division. If a new license of a different grade is issued, the old license shall be destroyed by the examiner
522 CMR 2.02
2.02: Records
(1) the engineer or fireman is held responsible for the proper operation of the Boilers and shall complete and sign the Operators’ Record Book on a daily basis. These records shall be made available to the District Engineering Inspector upon request.
(2) In the event of a Reportable Accident/Incident, the Owner/User or the Engineer in Charge shall notify the Massachusetts Emergency Management Agency at 508-820-1444 within 24 hours of the event.
(3) All Engineers and Firemen in charge shall notify the Department in writing, within seven days of his or her appointment, of the location of the Boilers and/or engines of which he or she is in charge. When accepting or leaving a position as an Engineer or Fireman in charge,
(4) The Engineer in Charge is the actual authority for the operation, maintenance, and repair of the Boilers, All persons operating, repairing or maintaining these Boilers do so under the direct authority of the Engineer in Charge. Engineer in Charge shall make daily visits to the plant. Individuals performing duties as the Engineer in Charge will leave daily written instructions to the operating personnel and those instructions will be made available to the District Engineering Inspector upon request. The Engineer in Charge shall sign the Engineer’s Record Book, as provided for in M.G.L. c. 146, § 51, on a daily basis and shall review the Operator’s Log Book on a daily basis. It is reasonable for the Engineer in Charge to perform his or her duties at the facility five working days per week.
Chapter 146, Section 2: Rules in general; prescription of tests; form of certificate of inspection; assistance of attorney general
Section 2. The board shall formulate rules or adopt rules formulated by a recognized engineering organization, for the construction, installation and inspection of steam boilers and power reactor vessels and piping as used in atomic energy installations and for ascertaining the safe working pressure to be carried therein; prescribe tests, if it deems it necessary, to ascertain the qualities of materials used in the construction of boilers, power reactor vessels and piping; formulate rules regulating the construction and sizes of safety valves for boilers of different sizes and pressures, appliances for indicating the pressure of steam and the level of water in the boiler or power reactor vessel, and such other appliances as the board may deem necessary to safety in operating steam boilers or power reactor vessels; and make a standard form of certificate of inspection. The attorney general shall assist the board in framing the rules. Such rules shall be transmitted to the commissioner and be by him filed in the office of the state secretary, and when so filed shall have the force of law.
What is referenced in Chapter 146, Section 46
NECESSITY OF LICENSES “PERIODIC ATTENDANCE” BOILERS 9 TO 250 HORSEPOWER (AGGREGATE) “NONCONTINUOUS ATTENDANCE” BOILERS 251 TO 500 HORSEPOWER “CONTINUOUS ATTENDANCE” BOILERS OVER 501 HORSEPOWER
What is referenced in Chapter 146, Section 48
Ascertainment of horsepower Boiler HP USE MANUFACTURERS TAG (IF AVAILABLE) STEAM OUTPUT (LBS/HR) DIVIDED BY 34.5 BTU/HOUR INPUT DIVIDED BY 41,840 BTU/HOUR OUTPUT DIVIDED BY 33,475
ENGINE HORSEPOWER P.L.A.N. 33,000 P = MEAN EFFECTIVE PRESSURE L = LENGTH OF STROKE A = AREA OF HP PISTON N = NUMBER OF STROKES/MIN. SIMPLE ENGINE = 40 PSI, CONDENSING ENGINE = 50 PSI COMPOUND ENGINE = 70 PSI VARIABLE SPEED USE AVERAGE SPEED
TURBINE HORSEPOWER BASED ON EXTERNAL DIAMETER OF STEAM SUPPLY PIPE LESS THAN 1 ¾ INCHES = < 9 HP > 1 ¾ - 3 ½ INCHES = 50 HP > 3 ½ - 5 INCHES = 150 HP > 5 INCHES = UNLIMITED HP