List the Hagerstrand constraints
Why is so complex to capture behavioural richness of activities?
Define ABM
The way in which observed behaviour depends on the activity patterns of people and households within their constraints in time and place
What is a base
base locations, like fixed work locations and home, determine the opportunities to
conduct more flexible activities such as buying the groceries and attending
the theatre.
What is an action space?
The three constraints define a 3d prism, when projected 2d - designates potential action space where all activity places that can be visited within a time frame
What are the three categories of action spaces?
Circular - journey starts and ends same place
Linear - starts in one base and ends in another
Elliptical - time left over from necessary time to travel between bases that is used to visit other places en-route
Two behavioural rules that influence travel behaviour
2. Travel time ration
Explain the temporal sorting of activities (FITAS)
Flexible activities can be pursued in time intervals. People have these certain intervals (short and long), before commutes, during commutes, during lunchbreaks, commute home etc. Non working days - fewer but longer. People want shortest intervals for compulsory so longer leisure.
Explain travel time ratio
ratio by dividing travel time to activity by sum of travel time and activity for same location
What does MASTIC do?
facilitates the assessment of potential impact of time policies (business hours, working hours), transport policies (bus stops, road construction) and spatial policies (density of activity places) on the opportunities for people to undertake their desired activities
Four MASTIC variables:
distance between bases, length of time window, speed of transport mode, travel time ratio.
Pros and cons of ABM:
Pros of ABM
✓ Continuous time dimension
✓ High spatial resolution (address)
✓ Considers complex mobility if a person (multiple tours, time, budget)
✓ Decisions can be modelled closer to human behaviour
Cons of ABM
▪Lots of effort and data required to build the model
▪Relatively unstable (variations are wide)
▪Higher run time (time consuming)