BOP Elastomers should have a temperature rating of ____ degrees C and a peak working rating of ____ degrees C for one hour emergency services.
121C
177C
Flexible hoses should have a temperature rating of ____ degrees C and a peak working rating of ____ degrees C for one hour emergency services
121C
160C
Drilling fluids usually consist of brine solution. Increase in temperature will ____ the effective brine weight.
Decrease
Why are ECD’s a consideration in thermal wells?
ECD’s increase with measure depth, losses might occur into the pair well as the fracture gradient of the horizontal formation doesn’t change.
The recommend reserve drilling fluid additives and volume while drilling thermal wells are ___%.
50%
True or False: any well drilled into, or in close proximity to a thermally enhanced reservoir can be considered to be a Thermal well.
True
True or False: While drilling a thermal well, risks are associated with drilling the vertical section as the caprock integrity might be compromised.
True
Key steps in producing the drilling program for a thermal well are :
When drilling both the caprock & thermal sections of a well the following should be considered: