LVTO Precision Approaches
CAT II
DH 200ft - 100ft
RVR 300m midpoint 150m stopend 75m
LVTO Precision Approaches
CAT IIIA
DH 100ft - 50ft
RVR 200m midpoint 125m stopend 75m
LVTO Precision Approaches
CAT IIIB
DH 50ft - 20ft
RVR 200m - 125m
RVSM altimeter limitations

ETOPS en-route ALT planning minima
Precision Approach: (DH/DA) + 200’, VIS + 800
Non precision (MDH/MDA) + 400’, VIS + 1500m
APU limitations
on ground:
bleed + electric 15000’
in flight:
bleed + electric 10000’
bleed 17000’
APU electrical load 41000’
Loadsheet figures
LMC: [+or-] 400kg Traffic Load
[+or-] 1000kg fuel in center tank
Pax + Hand luggage Male 88kg Female 70kg Child 35kg
Crew + Hand luggage Flight Crew 85kg Cab. Crew 75kg
Crew checked bagage 20 kgs
infant bagage 10 kgs
zamzam water 100ml hand, 10L checked
FO restrictions
1. Runway not contaminated
fuel spillage procedure
1. Stop Refuelling
RVSM diversion procedures
Procedures requiring Rapid descent, Turn Back Diversion & Weather Deviation in Oceanic Airspace
*IF unable ATC clearance, turn at least 45 degrees (90 for Middle East regions) left or right OFF the track in MID/EURO/RNP5 & 15NM in Indian RNP10 airspace. Once on a lateral offset track, climb or descent 500’
* WEATHER DEVIATION >
1- Establish communication & alert near by aircraft on freq in use and as well on 121,50 and 123,45 2- Set Transponder to code 7700 & watch for traffic 3- Turn on all exterior lights 4- Deviation less than 10NM, remain at assigned level till more than 10NM
EAST 000-179 mag Left desc 300’ / Right clmb 300’
WEST 180-359 mag Left clmb 300’ / Right desc 300’
NDSC
No reduced thrust if:
Alternate mimima
Cat II & IIIA (qualified pilots) –> CAT I (RVR)
CAT I –> NP (RVR + ceiling above MDH)
NP –> NP MDH + 200’ VIS + 1000m
(Circling –> Cirling)
Crosswind limitations vs braking action

IN FLT Fuel Management: Expect Arrival Fuel at DEST is less than ALT + FR (within 1 hr of DEST) Capt may decide to land at DEST with not less than FR if:
[1] Actual and forecast WX at DEST permit visual approach
[2] No ATC delays for the period ETA - ETA + 1 hour
[3] At least 2 separate Runways with seperate APP facilities based on separate aid.
Ceiling is defined as:
lowest layer of cloud height above ground or water below 2000’ more than half of the sky. To be considered for NP APP ONLY
Max tire speed:
195kts