Talk me through the options you considered at Rawcliffe Bridge Primary School?
Option 3 - New build extension to the school
- Suitable location, foundation requirements, planning, M+E, cost, programme
In what circumstances would a temporary modular classroom have been preferable?
What are the limitations of temporary accommodation in a school setting?
What construction technology issues did you consider when adapting an internal school space at Rawcliffe Bridge?
How do you determine whether walls are loadbearing before making alterations?
What issues can occur when repurposing a room that was not originally intended for teaching or nurture use?