Construction Technology Lvl 2 Flashcards

(5 cards)

1
Q

How did you apply constrution technology knowledge (UHL Small Ward CT)

A
  • Understood CT scanners produce radiation
  • Room would need specialis shielding
  • After discussing with designer, updated partition rate build up to include lead backed plasterboard
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What impact did the lead sheilding have on costs (UHL Small Ward CT)

A

Significantly more expensive (circa £150 plus per m2)
Room - 35m2 (5.5m x 6.5m)
Walls - 75m2 (24m x 3m)
Cost - £25k uplift from £13k

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Other materials that were considered (UHL Small Ward CT)

A

Concrete was considered, it is:
- Thicker
- Cheaper
- Slower construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Why were bored piles chosen instead of driven piles

A

Extension within hospital estate
Vibration and noise needed to be minimused to avoid disturbing patients and medical equipments

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How did the modular build affect technical considerations

A

Mod units require precise and reliable foundation solutions to ensure accurate placement and alignment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly