The basis that is used to allocate costs to cost objects (i.e. the number of material receipts in our
example) is called an allocation base or cost driver.
Where allocation bases are significant determinants of costs the terms
cause-and-effect allocations or driver tracing are used
Where a cost allocation base is used that is
not a significant determinant of its cost, the term arbitrary allocation is used