What does a DFA team consist of?
A parent breaker, a normally closed smart switch, a normally open smart switch, and an alternate breaker.
What is the 90% Rule for picking up load?
If the breaker is rated at 480A, then you can pick up 432A. If the breaker is rated at 600A, then you can pick up 540A.
What is a 2 team DFA team?
They are teams that share a normally open smart switch.
What 10 things will cause a DFA team to go into manual?
What switches are telemetered?
KLS, KLC, PDS, PDC & reclosers
How do you set up clearances with Telemetered Switches?
What needs to be done to a Team Switch inside of a clearance?
When should Teams be returned back to auto?