Max permissble time for ground operation with the battery power only?
5 minutes, to prevent the EICAS CRT screens from overheating
Where is the external AC power receptacle located?
Lower, right side, forward nose area
What is the AC electrical system rated at?
115 VAC, 400 HZ, 3 phase
What is the voltage rating of the DC electrical system?
28 VDC
What is an Integrated Drive Generator (IDG)?
An AC generator combined with a constant speed drive.
Max engine generator load
40 KVA to 41,000 ft
what is a TRU?
Transformer rectifier unit
What is the function of the TRUs?
To convert 115 VAC to 28 VDC
Max TRU load
120 amps
How many TRUs are installed in the CRJ 900?
4
Where are the TRUs located?
In the nose compartment
How are the TRUs cooled?
Cooling fans located under the TRUs
When do the TRUs come online?
When AC busses are powered
Where is the main battery located?
In the nose compartment
Main battery rating
24 VDC/17 amp hour
Where is the APU battery located?
In the aft equipment bay
APU Battery rating
24 VDC/43 amp hour
How many generators are on the CRJ 900?
4 (2 engine generators, 1 APU generator, 1 ADG)
What happens when the Battery Master switch is selected ON?
The main battery bus will be powered by the main battery direct bus, and the APU battery direct bus
If the main buses are powered, are the essential buses also powered?
Yes
What controls the DC bus tie contactors?
The DC power centers (DCPC) automatically control DC bus tie contactors
When will the air driven generator (ADG) automatically deploy?
With complete loss of A/C power.
With the ADG deployed, what items are powered?
AC ESS bus, hydraulic pump 3B, flaps/slats, STAB trim CH2
ADG max load
15 KVA