What are epri research portfolio?
Focus 2013 for P94
key issues in 2013 for P94?
what are the base programs?
What is ESIC (energy storage integration council)?
what is the approach for ESIC?
What is 94.001
Strategic intelligence and tech assessments
what is cost and technical capabilities of energy storage project?
deliverable: cost and technical capability of energy storage (cost database).
approach: conduct technology deep dives on individual technologies to understand present and future costs and capabilities. focus on lithium ion batteries this year
What is 94.002?
what is distributed ES options for Power Delivery
what is 94.003
Bulk Power Energy Storage Solutions
supplemental: battery storage systems and applications demonstration
supplemental two: assessment of grid benefits of fuel cell at utility substation
Supplemental: tool for distribution level energy storage assessment and integration
case study based distribution level energy storage assessment
apply tool to participant utilities
develop and validate impact/value integration specification framework
–conduct case study on one feeder
–understand how to determine an avoided cost case
–develop algorithum of storage operation
supplemental project: Advanced CAES demo (robert)
PG&E: 25M cost share to design build 300MW 10hour plant total project cost about 300M to 450M
–NYPA 2M cost share to desin and build 10MW-4.5Hour plant using an aboveground air store, total project cost 20M to 22M
approach
what are ESIC’s four represenations