Identify three inherent limitations of internal controls.
Identify two reasons for assessing control risk at the maximum level.
When should the auditor assess the design effectiveness of internal control?
In planning every audit under generally accepted accounting standards (GAAS), as a basis for determining the nature, timing, and extent of further audit procedures
When should the auditor assess the operating effectiveness of internal control?
Whenever the auditor contemplates a reliance strategy (which means the same thing as “assessing control risk at less than the maximum level”) and only after performing the appropriate tests of control