Minimum overdig for crawl space foundation
2 feet
Name three things considered when excavating a foundation with excess dirt?
Protection for equipment of pavement/curbs
What should be accomplished by rough grading of a lot?
Tools needed to check excavation
When is a driveway excavated for a house with integral garage?
During back fill
What are three solutions for rock problems?
Why should excess fill be removed during excavation?
- appearance
What phases should be completed before backfilling for rough grade?
What establishes final grade
8” minimum below framing member
-remove large debris from lot
Driveways and walks poured and complete
How far below the bottom of the lowest framing member should the final grade be held at a minimum and why.
- to keep water running away from house
When grading home, how far should equipment stay away from house.
2 feet
What is minimum overdig for full basement foundations.
3’
What is the minimum overdig for knee wall foundation ?
2’
What is the minimum overdig for crawl space?
2’