F120 Flashcards

(15 cards)

1
Q

What are the five phases of the Defense Acquisition System?

A
  1. Materiel Solution Analysis 2. Technology Maturation and Risk Reduction 3. Engineering and Manufacturing Development 4. Production and Deployment 5. Operations and Sustainment

The Defense Acquisition System includes three milestone decisions within these phases.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the entry point into the acquisition process for all defense acquisition products?

A

Materiel development decision

This decision marks the beginning of the acquisition process.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

In which Major Capability Acquisition phase does competitive prototyping take place?

A

Technology Maturation and Risk Reduction

This phase focuses on reducing risks associated with technology.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the objective of the Operations and Sustainment phase?

A

Execution of a support program that meets materiel readiness and operational support performance requirements and sustains the system in the most cost-effective manner over its total life cycle

This phase emphasizes sustaining the system throughout its lifecycle.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What authority allows the DoD to utilize up to $200M to address an urgent need?

A

Rapid Acquisition Authority

This authority is crucial for responding to urgent operational needs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who is responsible for balancing cost, schedule, and performance in defense acquisition?

A

Project, program, or product managers

These managers play a key role in ensuring project success.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the characteristics a materiel solution MUST do known as?

A

Key performance parameters

These parameters define the essential characteristics required from a materiel solution.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What does ACAT designation determine?

A

The level of review and who will make the milestone decisions

ACAT stands for Acquisition Category.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What package formally recommends a new or modified organizational structure?

A

Force design update (FDU)

This package is generally developed by branch proponents.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which organization finalizes and documents the TOE and BOIP?

A

USAFMSA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The _______ lists the planned placement of quantities of equipment and associated support items.

A

BOIP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What document contains four critical elements related to organizational change?

A

Unit reference sheet (URS)

These elements include narrative, unit mission/capabilities, organizational structure, and graphical depiction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What kind of analysis does HQDA conduct to determine if proposed changes are suitable, feasible, and acceptable?

A

FIFA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

A TOE prescribes the doctrinal wartime mission, the organizational structure, and the personnel and equipment __________ for a military unit.

A

Requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is a vital part of the FDU process to ensure all impacted Centers of Exellence can address second- and third-order effects of organizational change?

A

Worldwide staffing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly