Both strategic and tactical target
1) Collection
2) Transmission
3) Treatment
4) Distribution
Coal fuel power plant, less efficient than base load. Usually 15 to 30 years old facility, operate 6 to 8hrs a day
motor and pump
Order of priority in accordance with mission requirement
Curves, switches, frogs, and crossovers
SOMPF, part 1 MTF, Section 2 and 3
1) Treatment
2) Collection
3) Transmission
4) Distribution
Turbine General Assembly
30 minutes
(3.14 x R^2 x height of cone ) divide by 100 = lbs of explosive
Unload Conveyer Crushed Coal bunker Pulverized Blower Boiler
Diesel / Jet engines (ICUs). It operate on peak time, least cost effective bulk electric power
Fractionation tower
Charge placed at minimum 5 feet underwater
STANAG 2123
True
Tension members
The main difference between a BWR and PWR is that in a BWR, the reactor core heats water, which turns to steam and then drives a steam turbine
At minimum 20 feet
targets of opportunity, and survivability of assets
An electrical grid is an interconnected network for delivering electricity from producers to consumers.
Part 1: Mission Tasking Package
Part 2: Target intelligence package
Part 3: Plan of Execution
Uranium 235