what are the four entities involved in a building?
-client, designers/archtiects, consultants (E), contractors
site selection
building’s structural integrity depends on the soil type and its strength under loading
the measure of a soil’s strength is its bearing capacity in kg per centimeter square.
site preparation
- very important before designing to divide the area by the weight = soil strength
wind pressures - a structural system
the stress of the wind on buildings
annual prevailing wind conditions
impact loads - structural system
vertical and horizontal analysis
vibration and earthquakes - structural system
- fixed-base vs. base-isolated structure: preventing modes to occur
5 main criteria when selecting a structural system
difference between bearing wall system vs post and beam system
bearing wall system = untilizes rigid vertical planes to support building loads and transmit them down to its foundation
post and beam system = transmits forces laterally along its length to its supports. beam carries load experience bending stresses
-looks light in form
3 foundation requirements
Foundation settlement
uniform settlement vs. differential settlement
-differential settlement = parts of the foundation of a building may suffer different magnitudes of settlements due to variation in load on the foundation or soil conditions
weak link
weak link is implemented to connect low and high ruse buildings to prevent any cracking
structural joints
expansion joints and construction joints
settlement joints
two separate joints because of the high and low rise buildings
stability of soil
soils abiliting to retain its structual propterties under varying conditions
site selection steps
site design steps
construction process steps
excavation
slurry wall
bracing
three methods of bracing
factors that affect the choice of type - foundation
2. structural requirements, including: foundation, loads, buildings configuration, and depth
secondary factors that may be important - foundation
two types of foundation
shallow foundation (footing) = strip, pad, and raft (solids slab raft, beam and slab raft, and cellular raft)
deep foundation = caissons, piles, selamic base isolation (for high rise building)
strip - shallow foundation
the formation is in a strip of linear structure that ultimately serves to spread the weight across the total area of the soil (UPSIDE DOWN T)