13,800 V 25,000V 115 KV 230 KV 345 KV
2)-What is the difference between a radio 5K circuit and a network 5K circuit?
Hey 5KV radio circuit has one source station and therefore feed only in one direction 85KV networks Circuit feeds from to source stations most commonly referred to P and use primary Netwerk units giving it a two way feed
3)-From the appropriate prints examiner will ask you to identify and explain the different lines and symbols of each of the following 15 KV circuit print 5KV circuit print secondary sheet secondary network sheet construction sketch Netwerk feeder
Go to the prints
4)-Describe the secondary networks system from the substation to the customer service.
The secondary Network Systems supplied via 13,800 volts networks feeders which originate from one of six networks substations station 2,12 ,53 ,71 ,492 and 514 the feeders supply network transformers in either a secondary Netwerk vault or tertiary network vault voltage is step down to one 120/208 or 277 /480 V it is then distributed normally by 4/0 seven wire mains or 500 MCM 4 wire main through manholes and eventually to the customers prem
6)-Describe the method of numbering DSS lines
DSS lines the number of the station that is being supplied followed by a hyphen, after the hyphen , lines under 19,999 V will be numbered 51 through 299, or 1000 through 1999 with the voltage identification number 1 directly following the hyphen lines from 20,000 to 29,999 will have a four digit number directly following the hyphen the first digit being 2
Describe the method of numbering 5kVA Distribution circuit
5KV Distribution circuit numbered for the station where they originate followed by a hyphen, the number of the Circuit assigned 1 through 24 distribution Circuits, 25 to 50 are series circuits .th hyphen is iomitted when the originating station is only two digit. Between primary Netwerk units (PNU) identify with the letter N between the PNU numbers ( lowest number first, highest number second)
4)-Describe the method of number in Cambridge lines
800 series are reserved for the Cambridge DSS lines
120/208 volts and 277/480 volts
###7)-Identify the following a 126–04 B 3606 C 101–104 D875-1312 E 2–1n33 F 292-h7 G 6 N 7 H 110-2211
A 5KV radio distribution circuit B 5KV radio distribution Circuit C 15 KV distribution system supply line
D 15 KV Cambridge Distribution system supply line
E 15 KV secondary Netwerk Feeder
F 15 KV distribution Circuit
G 5K the primary Netwerk Circuit
H 25KV distribution system supply line
A system change notice is the form used to notify the system operator of any changes on the system. It is required when new or changes of equipment are connected to the system that were not already documented. Normally system changes are communicated through the permit process and documented. When work is performed outside the permit process the system change notice services to update the records for the system operator and is required . (See(OG-3B)
A 5Kv
B 15 KV
C 25KV
A 4160 V, 2400 V
B 13800 volts, 7960 V
C 24,000 V, 13,870 V
10 how are the individual phases of a circuit identified?
A)5K V phases A-B-C and system ground (D leg)
B)15 KV phases A-B-C
C)25KV phase C-A-B
11) to what conductors of a 5KV circuit are the single phase leads of a transformer connected?
There are three possible combinations
A system ground (D-leg)
B system ground (D-leg)
C system ground (D-leg)
12 ) to work conductors of a 5KV circuit are three phase transformers connected for the following installations :
A )conventional transformers A-B-Cphase wires only NO D-leg connection
B) Fused type transformers
A-system ground B-system ground C-system ground
(three individual ground required for each transformer)
C) pad mount transformers A-B-C only ;with bonding to system ground and a driven ground rod
Clerance- will be given when a zone of protection can be established :using visible brakes and grounds surrounding the work area .clearance tags are applied to all open points of known sources
and caution tags applied to identify devices in off schedule position
Permission is given when a zone of protection is established .
work must be tested deenergize and performed using live line methods
Construction tags
are white tags
they shall be installed on new Eversourse equipment or new customer equipment during the construction.
That is not under the jurisdiction of the system operator
a caution tag is required at the disconnect point of demarcation between the construction and the equipment under the jurisdiction of the system operator
14)explain what disconnection of ground you would expect to have between a live bus and your work in the street on a circuit which has been Deenergize and tag buy you A)-5K V distribution circuit
A) 5KV distribution Circuit :
The Zone of protection will be established by
opening all devices surrounding the work
-installing permission tags on all known sources
- caution tags will be use on all open points that are not known sources and devices that are off schedule
14)- B15 KV Distribution circuit
15 kVA Distribution circuit: the zone of protection will be established by
opening devices surrounding the work area and installing Clerance tags
grounds will be installed at the closest point of the work to be performed when practical
14)-C secondary Netwerk feeder
C)-secondary network feeder
-all protectors will be confirmed open by testing the feeder dead back
-primary switches will be confirmed in the ground position at the closest point surrounding the work area and the feeder will be grounded at the station cubicle
#stations go to primary switch and verified#
15)-Explain the rubber glove rule as it pertains to the underground
Protective gloves are required as directed in the employee safety manual (section 8.5 sub par a - M)
-class 1 gloves are required for liveline method on four KV circuits
-class 2 gloves are required -when employees are operating 5KV oil switches remotely
-gloves required “lock door to lock door” for energize switchgear or enclosures -when employees are working on secondary cable that is or may become energized at 50 V or above
-when using or holding any test equipment that is or may Become energize at 50 volts ir above
explained are listed in section 8–5.2 subpar A- F
16) what protective clothes are required when performing switching operations on pad mount equipment
Hardhat
17)-how are fall indicators identified on a circuit print?
A) FA auto reset type
B) FM manual reset
18)-what side of the switch would fall indicators be installed on?
Fall indicators should be placed on the load side of the switch