Heysham and Morecambe
4 defence options: Hold the line Do nothing but monitor Retreat the line Advance the line
Strategy 1
Rock armour to enhance and protect existing sea wall
Boulders of locally sourced limestone placed along promenade
Strategy 2
Breakwaters and rock groins
10 of these built at intervals in front of the town
Just under 1 mil tonnes of locally sourced limestone boulders used
Strategy 2
Breakwaters and rock groins
10 of these built at intervals in front of the town
Just under 1 mil tonnes of locally sourced limestone boulders used
Strategy 3
Repaired and replaced sea walls
Between 2015-18 4km of 30 year old sea wall was replaced