What are the FOUR steps when carrying out an inspection?
What should you take on an inspection with you?
What should you consider in the immediate surrounding area of the property when conducting an inspection?
What should you consider when conducting an external inspection?
What should you consider when conducting an internal inspection?
What are the different ways that you could date a building?
What are the THREE different purposes of inspection?
If inspecting a property for valuation purposes, what would you be looking out for?
Valuation influencers -
Factors which can influence the valuation of a property such as location, tenure, aspect, form of construction, defects, current condition, occupation details
If inspecting a property for agency purposes, what would you be looking out for?
Marketability issues -
Current condition of the building, repair and maintenance issues, statutory compliance, services, presentation and flexibility of the accommodation and its marketability
What are the FOUR common forms of foundation?
What determines the type of foundations used?
What are the TWO types of wall construction used?
2. Cavity wall construction
What is a solid wall construction?
Solid brickwork with headers, normally at least one brick thick, with different bricklaying patterns incorporating headers (e.g. Flemish bond) to tie together the layers of brick
What is a cavity wall construction?
What is a stretcher?
Brick laid horizontally, flat with the long side of the brick exposed on the outer face of the wall
What is a header?
Brick laid flat with the short end of the brick exposed
What is efflorescence?
What is spalling?
Damaged brickwork where the surface of the bricks starts to crumble because of freeze/thaw action, after it has become saturated in the winter months
What are the institutional specifications for shops?
What are the two main methods of construction for new office buildings?
What can you refer to if you’re unsure about what form of construction is?
* Building manual
What is the current institutional specification for offices (as defined by the British Council for Offices Guide to Office Specification, 2019)?
What are the different types of air conditioning systems?
What is a shell and core fit out?
Where common parts of the building are completed, and the office floor areas are left as a shell ready for fit out by the occupier