What are the FOUR steps when carrying out an inspection?
What should you take on an inspection with you?
What should you consider in the immediate surrounding area of the property when conducting an inspection?
What should you consider when conducting an external inspection?
What should you consider when conducting an internal inspection?
Start at top and work way down
What are the different ways that you could date a building?
What are the THREE different purposes of inspection?
If inspecting a property for valuation purposes, what would you be looking out for?
Valuation influencers -
Factors which can influence the valuation of a property such as location, tenure, aspect, form of construction, defects, current condition, occupation details
If inspecting a property for property management purposes, what would you be looking out for?
• Occupied: check the lease compliance, statutory compliance, state of the building, requirement for repairs/redecoration, user and details of the actual occupier
• Unoccupied: check statutory compliance, state of the building, repair and maintenance issues, security arrangements, landscaping, risk of vandalism and damage to the building
If inspecting a property for agency purposes, what would you be looking out for?
Marketability issues -
Current condition of the building, repair and maintenance issues, statutory compliance, services, presentation and flexibility of the accommodation and its marketability
What determines the type of foundations used?
What are the TWO types of wall construction used?
What is a solid wall construction?
Solid brickwork with headers, normally at least one brick thick, with different bricklaying patterns incorporating headers (e.g. Flemish bond) to tie together the layers of brick
What is a cavity wall construction?
What is a header?
Brick laid flat with the short end of the brick exposed
What are the institutional specifications for shops?
What are the two main methods of construction for new office buildings?
What can you refer to if you’re unsure about what the form of construction is?
Architect’s drawings and specification
Building manual
What became illegal to use in air conditioning systems from 1st January 2015?
Use and replacement of the low temperature refridgerant R22
Existing R22 refridgerant systems needed to be modified to become more environmentally friendly
What is a shell and core fit out?
Where common parts of the building are completed, and the office floor areas are left as a shell ready for fit out by the occupier
What is the difference between a Category A and Category B fit out?
What is the main method of construction for industrial buildings?
Steel portal frame building with insulated profiled steel cladding walls and roof
What is the difference between an inherent and a latent defect?
What FOUR steps should you follow if you identify any building defects during an inspection?