How would you undertake an inspection?
Four step process:
1. Consider personal safety, and carry out a desktop review to access whether PPE is required, occupiers in the vicinity, transport links etc.
What would you take on an inspection?
What are the different inspection purposes and what aspects are considered?
What are the common forms of foundation?
What are common brickwork construction methods?
What are common brickwork defects?
What are the institutional specifications relating to shops?
What are the institutional specifications relating to offices?
Current institutional specification for offices (defined by British Council for Offices Guide to Office Specification, 2023, may include:
- Full access raised floors with floor boxes.
- Ceiling height of 2.6m-2.8m
- Passenger lifts
- Air conditioning
- Double glazed windows
- 1 cycle space per 10 staff
- 1 shower per 100 staff
- 8m2 - 10m2 general workplace density
- Maximum opportunities for daylighting, with 300-500 lux average.
- Planning grid of 1.5m X 1.5m.
What are the types of Air Conditioning?
Jan 2015 - use and replacement of low temp refrigerant R22 is illegal, Existing R22 refrigerant systems needed to be modified to become more eco-friendly.
What are the types of fit out?
Shell and core - where common parts of the building are completed, and the office floor areas are left as a shell ready for fit out by the occupier
Category A fit out - such as Grade A specification as above
Category B fit out - to complete the fit out to the occupiers specific requirements, such as installation cellular offices, enhanced finishes, IT etc.
(Cellular offices typically set out on a 1.5m planning grid)
(Typical space allowance for normal office use is approx 1 person for 7.5-9.25 sqm)
What is the standard construction and specification of industrial / warehouses?
Usually a steel portal frame building with insulated profiled steel cladding walls and roof.
Current institutional specs:
- Min. 8m clear eaves height with 10% roof lights.
- Min. 30KN/sqm floor loading
- Plastic coated steel profiled cladding with brick or blockwork walls to approx. 2m.
- Full height loading doors (electric)
- 3-phase electricity (415 volts)
- 5%-10% office content and WC facilities.
- Main services capped off.
- Approx. site cover of 40%.
- LED lighting.
What’s the difference between an inherent defect and a latent defect?
Inherent Defect = a defect in the design or a material which has always been present
Latent Defect = a fault to the property that could not have been discovered by reasonably thorough inspection.
If you identify any building defects during an inspection, what would you do?
What are three main causes of defects?
How does building movement occur?
Subsidence is the vertical downward movement of a building foundation caused by the loss of support of the siute beneath the foundation. Could be from changes in the underlying ground conditions.
Heave is the expansion of ground beneath part or all of the building - could be from the removal of a tree and the subsequent moisture build-up in the soil.
Horizontal cracking in brickwork may indicate cavity wall tie failure in a brick wall
Shrinkage cracking often occurs in new plasterwork during the drying out process.
Other cracks may be due to differential movement such as settlement cracks.
Thermal expansion / movement can also cause cracks.
What are the types of damp and how are they caused?
Wet Rot - Caused by damp and timber decay. Signs include wet and soft timber, a high damp meter reading, visible fungal growth and a musty smell.
Dry Rot - Caused inside by fungal attack. Signs include fungus, (mycelium), which spreads across the wood in fine and fluffy white strands and large, often orange mushroom-like fruiting bodies, a strong smell and red spores, cracking paintwork and cuboidal cracking / crumbling of dry timber. It can destroy timber and masonry.
Rising Damp - Usually stops around 1.5m above ground level.
Condensation - Can be caused by a lack of ventilation and background heating. Signs include mould and streaming water on the inside of window or walls.
Damp can also be caused by leaking plumbing / air conditioning units / pipework.
What are common building defects?
Period residential / office / shop buildings:
Dry rot, wet rot, tile slippage on the roof, death watch beetle, damp penetration at roof and ground floor level, water ingress around door and window openings and structural movements / settlement.
Modern Industrial Buildings:
Roof leaks around roof lights, damaged cladding panels, cut edge erosion, blocked valley gutters, water damage from poor guttering or burst pipes and settlement / cracking in brickwork panels.
Modern Office Buildings:
Damp penetration at roof and ground floor level, water damage from burst pipes or air conditioning units, structural movement, damaged cladding, cavity wall tie failure and efflorescence and poor mortar joints in brickwork.
What is the key legislation / RICS guidance on contamination, what are the three phases of a contamination investigation, and what approaches would you take in valuing a site with contamination?
Environmental Protection Act 1990 | RICS Guidance Note ‘Contamination, the Environment and Sustainability’, 2010 (3rd Edi.)
Typical Phases of an Investigation:
1. Review site history with a desktop study, site inspection and investigation.
2. Investigation to identify nature and extent of contamination with detailed soil samples taken using bore holes (intrusive).
3. Remediation report setting out remedial options with design requirements and monitoring standards.
Land Remediation Relief (LRR) is a form of tax relief that applies to contaminated or derelict land in the UK. It allows companies to claim up to 150% corporation tax deduction for expenditure in remediating certain contaminated or derelict sites, or those affected by Japanese Knotweed.
What are deleterious materials and provide some examples?
Deleterious Materials can degrade with age causing structural problems.
Common signs / clues to potential problems include brown staining on: concrete, concrete frame buildings and 1960s and 1970s buildings, plus modern buildings.
Deleterious Materials include:
- RAAC (Reinforced Autoclaved Aerated Concrete) - topical issue
- High alumina cement
- Woodwool shuttering
- Calcium chloride
What are hazardous materials and provide examples?
A hazardous material is harmful to health.
Materials include:
- Asbestos
- Lead piping / paint
- Radon gas
Recommended specialist reports and make appropriate assumptions in your advice.
Always check contents of an asbestos report / register.
What is the disposal of water?
What is Japanese Knotweed, what is the RICS guidance, and what are the associated penalties?
Japanese Knotweed is:
- Invasive plant which can damage hard surfaces e.g., foundations and tarmac.
- Not easy to control, costly to eradicate and a specialist company must remove and dispose of it.
- Great concern to property lenders who may refuse a loan if it is present or nearby to a property.
- Purple / green hollow stemmed with green leaves
- To be disposed of legally, such as by using chemical treatment, digging it out and removing it from site to a licenced landfill site in accordance with the Environmental Protection Act 1990.
RICS Professional Standard - Japanese Knotweed and Residential Property, 2022:
Purpose to address both the findings and provide guidance based on market informed industry best practice and recent research to ensure RICS members provide the best advice to users of valuation and condition reports.
Penalties:
- Allowing to spread is a criminal offence under the Wildlife and Countryside Act 1981.
- Magistrates’ Court can impose a max fine of £5,000 or max imprisonment of 6 months, or both. A Crown Court can impose an unlimited fine or max imprisonment of 2 years.
- Local authorities can grant Community Protection Notices (CPN) and fines up to £2,500 per person (£20k for an organisation) if landowners ignore it, don’t control it, or allow growth onto adjoining land.
- Other invasive species include Hogweed and Himalayan Balsam.
Why is lone working health and safety important?
Lone working H&S is important as there is an increased vulnerability, physical and verbal abuse risks, a mental health impact through isolation & stress, and legal obligations via employer responsibility and training and support.
How does condition differ from specification?
Condition refers to its current state or quality. It involves assessing the physical aspects of the property, such as its structural integrity, maintenance needs, and any defects.
Specification provides detailed requirements for a material product or service. Design specification details the materials, dimensions, and finishes for a building.