What are the institutional specifications for shops?
What are the two main methods of construction for new office buildings?
What is the current institutional specification for offices (as defined by the British Council for Offices Guide to Office Specification, 2019)?
What is the institutional specification for a Grade A office?
What are the different types of air conditioning systems?
What does LG7 lighting comprise?
Issued by the Society for Lighting and Light – for lighting offices – various rations – 5050 for task areas
What became illegal to use in air conditioning systems from 1st January 2015?
- Existing R22 refrigerant systems needed to be modified to become more environmentally friendly
What is a shell and core fit out?
Where common parts of the building are completed, and the office floor areas are left as a shell ready for fit out by the occupier
What does Cat B spec mean?
Fit out to occupier’s specific requirements e.g. IT, Cellular offices
What is the difference between a Category A and Category B fit out?
What is the typical space allowance for offices?
1 person – 80/100 sq ft
What is the main method of construction for industrial buildings?
Steel portal frame building with insulated profiled steel cladding walls and roof
What is the institutional specification for an industrial warehouse?
What are the various types of Air Con for an industrial unit?