Institutional Specifications Flashcards

(33 cards)

1
Q

What form of construction are most new shops?

A

Steel or concrete frame

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Services to shops are usually ______ ____.

A

capped off

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What type of floors and ceiling are usual for a shop?

A

Concrete floor

No suspended ceiling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What condition is a shop usually let in?

A

Shell with no shop front ready for retailer’s fitting out

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the two main methods of construction for a new (Grade A) office building?

A

Steel frame

Concrete frame

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How can you identify a steel frame office building?

A

Usually has less columns and a wider span between columns.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How can you identify a concrete frame office building?

A

Usually have more columns, lower floor heights and a shorter span between columns.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How can you check the form of construction if you cannot see on site?

A

Architect’s drawings/specification or building manual

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the office institutional specification ceiling height currently?

A

2.6m approx.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the current institutional specification for ceiling and raised floor voids for offices?

A

Ceiling void of 350mm

Raised floor void of 150mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What type of lighting is required in new Grade A offices?

A

LG7 compliant

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the maximum office depth area to allow for natural light?

A

12-15m

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the typical car parking ratio for offices?

A

1 space per 200sq ft for greenfield site

Depends on Local Authority guidelines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What floor coverings are standard per the institutional specification for Grade A offices?

A

Carpeting

Full access raised floors with floor boxes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is a VAV (variable air volume) air conditioning system?

A

Most expensive but most flexible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What type of air conditioning system has a lower capital cost and good flexibility but higher running/maintenance costs?

17
Q

What does VRV air conditioning system stand for?

A

Variable refrigerant volume

18
Q

What air conditioning system is a natural approach to climate control, but offer less flexibility?

A

Static cooling - chilled beam and displacement heating

19
Q

Which air conditioning system moves fresh air around a building?

A

Mechanical ventilation

20
Q

What is a simple form of air cooling system?

A

Comfort cooling

21
Q

What became illegal on 1st January 2015 relating to R22 refrigeration systems?

A

Certain repairs/replacement/removal.

Existing systems have to be modified to be more environmentally friendly.

22
Q

What type of fit out has common parts of a building completed and leaves office floor areas to be fit out by the occupier?

A

Shell and core

23
Q

What is a fit out to Grade A specification relating to offices?

A

Category A fit out to institutional specifications.

24
Q

What type of office fit out is completed to the occupier’s requirements e.g. installation of cellular offices, enhanced finishes, I.T.

A

Category B fit out

25
What planning grid are cellular offices usually set out on?
1.5m
26
What is the typical office space allowance per one person?
80-100 square feet
27
What is the basic construction of an industrial building?
Steel portal frame Insulated profiled steel cladding walls and roof
28
The current institutional specification for industrial buildings includes what features relating to eaves height and roof lights?
Minimum 8m clear eaves height. 10% roof lights
29
What is the institutional specification relating to walls in industrial buildings?
Plastic coated steel profiled cladding with brick/blockwork walls to approximately 2m.
30
What loading doors are set out by current institutional specifications for industrial buildings?
Full height, electrically operated.
31
What power is standard for industrial buildings?
3 phase electricity (415 Volts)
32
What percentage of industrial buildings is office/WC?
5-10%
33
Mains services to industrial buildings should be _____ ___.
capped off