LCC
LIFE CYCLE COST/ING
WHEN DOES THE CLIENT DON’T WANT TO KNOW LCC
5 TYPES OF L.C.C COSTS
M.O.D.I.T.S
1- INITIAL COSTS
2- SERVICE COSTS
3- MAINTENANCE COSTS
4- OPERATING COSTS
5- DISPOSAL COSTS
6- TRANSPO. COSTS
7 ACTIONS OF LCC
M.O.P._F.I.D2 - DRAW!!!
1- PURCHASE
2- INSTALLATION
3- OPERATING
4- MAINTENANCE
5- FINANCING
6- DEPRECIATION
7- DISPOSAL
CLARK CENTER, STANFORD UNIVERSITY CRITERIAS BY NORMAN FOSTER
STANDARD BASIC GLAZING: $400K
HVAC COST/ HOW MUCH HEAT GAIN: $
BASE OPTION VS. IMPROVED OPTION (DOING COMPARISONS) WCH ONE IS BETTER
SAVE 20K$ IF GO TO IMPROVED OPTION
- IMPROVED OPTION IS BETTER!!!! WORTH IT! PAY MORE BECAUSE YOU SAVE MORE MONEY IN ENERGY COSTS IN THE LONG RUN!
PAYBACK PERIOD
PAYBACK PERIOD OF CLARK CENTRE STANFORD UNIVERSITY
6 YRS
4 TYPES OF COSTS FOR VEHICLES; Metro Vancouver example
1- PURCHASE COST
2- FUEL COST
3- CARBON COST
4- LCC
L.C.A
LIFE CYCLE ASSESSMENT
6 COMPONENTS OF L.C.A (MEDPRU)
1- RESOURCES
2- PROCESSING
3- MANUFACTURING
4- DISTRIBUTION
5- USE
6- END OF LIFE
WHY IS TOYOTA PRIUS BETTER THAN CHEVY VOLT, THERE’S A NUANCE
-IF WE TAKE THIS OUT THE CHEVY VOLT IS NOT A GOOD OPTION ANYMORE!
IF WE WERE TRYING TO REDUCE UPFRONT CARBON, WCH ONE SHOULD WE USE?
CELLULOSE! PLANTS = RENEWABLE ENERGY!
CO2E
WHY USE LCA
4 FOCUS LCA
HOW DOES A BUILDING GENERATE
ENVIRONMENTAL IMPACTS? (9) C.U.T.E.M.M.I.R.D
RELELEASING EMBODIED CARBON THROUGH:
EXTRACTION
TRANSPORT
CONSTRUCTION
INSTALLATION
MANUFACTURE
USE
MAINTENANCE
RENOVATION
DEMOLITION
2 TYPES OF EMBODIED CARBON
1- UPFRONT CARBON
2- OPERATIONAL CARBON
What do you think is greater,
upfront or operational carbon?
ENVIRONMENTAL PAYBACK PERIOD (LCA STUDY)
Time it takes for the environmental impact
to be the same as the alternative
ALWAYS MAKE COMPARISON!
WHAT DO YOU CALL A CARBON THAT IS ALREADY EMMITED
UPFRONT CARBON
ALREADY IN THE PAST!
IT REALLY DEPENDS SUCH AS THE CITY, TRANSPO. CLIMATE FACTORS
ENVIRONMENTAL PAYBACK PERIOD ? HOW MANY YEARS COMPARED TO A NEW VS EXISTING BLDG
10 to 80 YEARS
WHAT IS THE MAGIC NUMBER (YEARS) FOR BLDGS
26 YRS
2050-2024 = COP TARGET!!!!!
BUCHANAN BUILDING, UBC ISSUE?
DEMOLISH AND BUILD NEW VERSUS
RENOVATE EXISTING BUILDING
THEY DID A STUDY, AND LCC MAYBE THEY CAN REUSE IT?