What is screening?
refers to narrowing of EIA application to projects requiring assessment b/c of perceived sig enviro effects and regulations.
What are the 3 approaches to screening?
What is the case-by-case approach to screening?
It is discretionary/criteria-based.
What is list-based screening?
List of projects for which EIA is required or not.
What is threshold-based screening?
Puts proposed projects in categories and sets thresholds for each type (ex. project size, emission level, pop affected).
What is the best approach to screening?
What does screening in Canada currently apply to (CEAA 2012)?
What does a designated project mean?
Carried out on fed land that is designated by Reg Designating Phys Activities or by the Minister of Env
What are the 3 responsible authorities able to carry out EA in Canada?
Although an EA is the responsibility of the proponent, res. authorities can carry out.
What are the 3 tiers of info in EAs?
a) general: location, consultation, details on other EIA legislation, identify affected agencies
b) project: description, construction scheduling, material requirements
c) site-specific: affected enviro components
What are the 2 types of EA?
What is the precautionary principle?
When scientific info is incomplete, but there is a threat present, lack of full certainty should not be used as a reason to preclude or postpone actions to prevent harm.
- should always be practiced in EA
How has the definition of enviro effect changed from 1995 to 2012?
1995: any change a project could cause in the environment, society, or economy (broad)
2012: any change to a component of the enviro under fed jurisdiction (ex. fish and migratory birds), on fed lands, or effects on Aboriginal peoples (narrow)
What are the potential outcomes of screening?
What is the ultimate goal of screening?
- ensure developments warranting assessment are not overlooked
What is an assessment conducted by a res authority occur?
When/what does/is an assessment conducted by a review panel (occur)?
- composed of group of experts appointed by minister
When was an EA in 1995?
What were the types of EAs in 1995?
What is required pre-EA in CEAA 2012?
Project description is for the purpose of screening (EA needed?)
Consists of:
- general info (location, consultation info, regulatory requirements)
- project info (purpose, size capacity, activity types, waste production)
- location info (geo coordinates, maps, proximity to residences)
- fed involvement (funding, land, permits)
- enviro effects (biophysical setting, description of changes that might be caused)
What is the “need for” and “purpose of” project sections in a project description?
Need for: problem project will address
Purpose of: what is intended to be achieved
Ex. we need electrical station for the purpose of supplying reliable, cost-efficient energy
What is scoping?
What are the main objectives of scoping?
- establish boundaries
What are the two types of scoping?