What is the design/award/build Delivery Method?
Typically begins when an owner hires an architect to develop a project program and its subsequent design and construction documents.
Benefits of this method:
-Owner participates in the design of the project.
What is the construction managment delivery method?
This allows the owner to address construction and cost issues during the design.
What is the Design/Build Delivery Method?
-Allows the owner to utilize a single entity that is responsible for both the design and construction of a project.
Advantages: