How many total points can be earned max for the Materials & Resource category?
13
How many prerequisites does the Materials & Resource category have?
2 -
Storage & collection of recyclables
Construction & demolition waste management planning
What are the credit categorizes for Materials & Resources?
A voluntary program which sets standards to wood product manufacturers to ensure responsible forest management in order to prevent deforestation & loss of habitat
Forest stewardship council (FSC)
A product stewardship policy approach that holds consumer goods companies responsible for managing their own products and packaging when consumers are finished with them
Extended producer responsibility (EPR)
GreenScreen
Method used to identify chemicals of high concern and safer alternatives
REACH Optimization
European union’s legislation that requires all chemicals sold to be evaluated based on their hazard profiles
Construction & demolition waste constitutes for how much total solid waste in the US?
40%
What is the first step toward conservation of materials?
Rightsizing the project
Reusing what can result in huge material savings?
Existing materials
Salvaged materials
Existing buildings
What types of materials can be salvaged and reused in new buildings?
Adaptive reuse is also called what? Give an example
Designing for flexibility;
Hospital flexible floor plans to change room sizes
Using efficient framing techniques conserves materials. Instead of placing studs 16 in apart, they can be placed ___ in apart
24
What is the best way to eliminate waste according to the EPA?
Source reduction
What is source reduction?
The exact sizing of the materials to be produced through prefabrication, modular construction, or similar methods, so that no waste is generated on site
When selecting materials for a building, what are the first two goals and project should have?
What is a Location valuation factor?
When LEED looks to see if materials for a project are extracted, manufactured & purchased within 100 miles of the site
LEED will award the project in the credit calculations for the location valuation factor by valuing those products at __% of their cost
200%
What are some features of environmentally preferable materials?
Rapidly renewable materials can replenish within how many years?
10
When a project team decides to not use some materials and reduce the total amount of materials in the building
Dematerialization
What is the cradle to gate assessment?
Evaluation of a product’s partial life cycle - from its resource extraction/harvesting to its becoming a manufactured product ready for resale at factory gate
Who created the cradle to cradle certificate?
Cradle to cradle products innovation institute
Cradle to cradle
Evaluates materials to have infinite lifecycles through recycling to form a closed system