1
Q

How many tons per hour can it produce?

A

150

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the furnace length & width?

A

70’ long and 42’ side

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the furnace reheat temperature for billets coming in?

A

2250

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What do the control zones do?

A

Heat billets to ideal rolling temp

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What happens in billet mapping?

A

Billets are validated for accuracy and stored for process history

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How many mill stands are there?

A

16

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the 3 types of stands?

A

Vertical, high horizontal and 4 roll universal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What do stands 1-8 do?

A

Roughing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are stands 9-12 called?

A

Intermediate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What do stands 13-18?

A

Finishing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the purpose of lathes?

A

Cut into the set-up rolls for shape pass

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What does the set-up shop do?

A

Prepares rolls for mill changes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which 2 stand numbers are the shear stands?

A

8 & 16

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the purpose of #8 shear stand?

A

Nose crop, tail crop, cobble cut, tail trim and 4 flat blades

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What does the #16 shear stand do?

A

Dividing shear to cut length for cooling bed; 4 crank and has 2 blades, changed with every product

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are the before and after cooling bed temperatures?

A

1800 entering and 250 cooled

17
Q

How many straighteners are there?

A

4 top and 4 bottom

18
Q

Cut then bundle or Bundle then cut?

A

Cut first then bundled

19
Q

What information is on the finishing tags?

A

Size, grade, length, count, weight, time, heat, crew and number

20
Q

What year was it built?