Approaches shall be planned and flown to comply with the approach sabilisation criteria.
What are the elements of the approach stabilisation criteria?
What are the requirements for a Stable Approach in regards of Lateral Path, Vertical Profile and Aeroplane configuration and Speed?
What is the company policy regarding the headset use and confirmation readback to ATC when there is only one pilot in an operating seat performing both roles of PF/PM?
Where turbulence is anticipated, the flight crew need to conduct the following actions:
Light Turbulence:
Moderate and Severe Turbulence:
Ref.: eLearning
If Unanticipated Severe/Extreme Turbulence is encounter the flight crew shall carry out the following actions:
Ref.: eLearning
A First Officer may not conduct the take-off if:
A First Officer may not conduct the landing if:
The PF should guard the control wheel, thrust lever(s), and rudder pedals:
When the Commander becomes responsible for the safety and security of all crew members, passengers and cargo on board?
As soon as he arrives on board, until he leaves the aircraft at the end of the flight.
Flight and/or Cabin crew are required to be on board while passengers are embarking, on board, disembarking?
Yes! Flight and Cabin crew shall be on board.
One member of flight crew is sufficient to meet this requirement.
A disruptive passenger is defined as a passenger:
Certain acts or conditions violate the law. Any person violating any of these or any other law or regulation may be removed from the flight and prosecuted to the extent of the law. Which acts or conditions are those?
The minimum requirements for pre-flight planning are for flight crew to check:
If the Commander for the flight has been delayed or is unavailable who shall conduct the cabin crew briefing?
First Officer, or
Augmenting Captain
The Commander or his delegate shall provide the following information to the crew:
The Commander shall seek the following information from the Purser:
What is the validity period for the daily maintenance check that is signed and certified by the Engineer?
48 hours. An aircraft shall not be dispatched on a flight, if a daily maintenance check would expire before the planned arrival time at the next station.
What fuel figure the Engineer will refuel the aircraft before the pilot inform him the Final Fuel?
3 tonnes below the OFP fuel figure.
Where permitted, the procedure for refuelling with one engine running is given in FCOM. This procedure may be used only if:
Which items must be checked on entering the aircraft to accept the aircraft?
The Commander has the authority to reject an aircraft prior to flight if he is dissatisfied with any aspect of airworthiness or maintenance status of the aircraft or the documentation.
What should be check in the Technical Log so the Commander accepts the aircraft?
The Aircraft Technical Log shall be reviewed to ensure that each pilot is aware of any defects or MEL items. This review shall include any Notices to Crew, entries from recent flights, and Acceptable Deferred Defects. The Commander shall establish Alternate Procedures if required by the MEL. If unable to determine such a procedure, he shall contact Fleet Technical Pilot or Flight Operations Engineer. MCC/VPNC may also be advised if necessary. It is preferable to review the Tech Log prior to commencing both the Exterior Inspection and the Cockpit Preparation.