1. What area of operation does each of the parts cover (Part A. B. C. D. E)?
A – General
B – En Route Authorizations and Limitations
C – Airplane Terminal Instrument Procedures and Airport Authorizations and Limitations
D – Maintenance
E – Weight and Balance
D085 – Aircraft listing
A010. Aviation Weather Information
A097 – Small Cabin Aircraft passenger and baggage weight program.
No.
A061 Electronic Flight Bag Program
A097 – Small Cabin Aircraft passenger and baggage weight
205lbs
A097 – Small Cabin Aircraft passenger and baggage weight
20 lbs. heavy baggage weight - actual lbs
B050 – Authorized Areas of Enroute Operations. Limitations and Provisions
B039 – Operations in North Atalntic High Level Airspace
B450 – Sensitive International Areas
C052 – Straight-in Non Precision. APV. and Category I Precision Approach and Landing Minima – All Airports
C075 – Category I IFR Landing Minimums – Circle to land Approach Maneuver
C054 – Special Limitations and Provisions for Instrument Approach Procedures and Instrument Flight Rules Landing Minimums
RVR 4500 (1800) ADD 100FT 1/2 Visibility
C055 – Alternate Airport IFR Weather Minimums
One suitable navaid 400ft – 1SM
Two suitable navaid 200ft – ½ SM
C064 – Terminal Area IFR Operations in Class G Airspace and air Airports without and Operating Control Tower – Nonscheduled Passengers and All-Cargo Operations
Yes. Need to have IAP. Approved source of weather (on-demand operations). Traffic advisory and airport status and facilities. IFR operations.
C073 – Vertical Navigation (VNAV) Instrument Approach Procedures IAP Using Minimum Descent Altitude (MDA) as a Decision Altitude DA/Decision Height DH
C077 – Terminal Visual Flight Rules. Limitations and Provisions
Yes but the need to have direct communication with air/ground communication facility or agent that provide airport traffic advisory and information that is pertinent to conditions on and around the landing surface and the flight is operated within 10 NM of the destination airport or visual reference with the lading surface is established and can be maintained throughout the approach and landing.
1. visibility +3SM
2. Ceiling 1000ft or greater
3. Cloud clearance
4. Ceiling and cloud clearance to maintain altitudes aplicable to airspace.
5. Controller Airports B.C or D within 10 NM.
C057 – IFR Takeoff Minimums. 14 CFR Part 135 Airplane Operations – All airports
1 SM or RVR5000
C079 – IFR Lower Than Standard Take Off Minima. 14 CFR Part 135 Airplane Operations – All airports
C081 Special Instrument and RNAV Visual Flight Procedures
E096 – Aircraft Weighing
36 Months Interval / 3 Years
C052 – Straight-in Non Precision. APV. and Category I Precision Approach and Landing Minima – All Airports
200ft– 1800 RVR