Method #15
Planned Routine
Method #16
Wrap up starts at the beginning of the sort. Keep grating clear.
Method #17
Move from load to load within your assignment without direction
Method #18
Scan ULD code on the inside of trailer, so all packages will be linked
Method #19
Utilize walk into or out of trailer load irregulars and straighten packages
Method #20
Do not double handle packages
Method #21
Load packages in a manner that leaves unobstructed exit walkway (maintains egress)