Bleed Air System (BAS) • Part of the Environmental Control System (ECS) • Bleed air can be supplied by: (2) • Systems that use pneumatic power: (4)
• Part of the Environmental Control System (ECS) • Bleed air can be supplied by: o Engines o Auxiliary Power Unit (APU) prior to engine start (ground operations only) • Systems that use pneumatic power: o Air Conditioning & Pressurization o Airframe De-icing o Air stair door seal o Engine oil cooling ejection system
Bleed Air System (BAS)
• Bleed air from the engines is ducted from the ___ and the ___
• ___ and the ___ determine which engine bleed port is to be used
• ECU has a left ___ channel with a left backup ___ channel and a right ___ channel with a right backup ___ channel
o Digital Channels - control the ___
o Analog channels - serve as a backup and are only able to control ___
• ___ Bleed air is use to actuate the “exterior oil cooler door”. Door opens when: (3)
• Bleed air from the engines is ducted from the Low-Pressure (LP) compressor port and the High-pressure (HP) compressor port
• Power lever position and the Environmental Control System ECU (Electronic Control Unit) determine which engine bleed port is to be used
• ECU has a left digital channel with a left backup analog channel and a right digital channel with a right backup analog channel
o Digital Channels - control the LP and HP bleed ports of their respective engines
o Analog channels - serve as a backup and are only able to control LP engine bleed air operations
• P2.7 Bleed air is use to actuate the “exterior oil cooler door”. Door opens when:
o Aircraft is on the ground
o Oil temperature > 100°C
o PLA
High Stage Precooler Operation
- How is HP bleed air (P3.0) cooled
Deice Precooler Operation
• Deice precoolers are incorporated in both engine bleed systems to reduce the temperature of the bleed air going to the airframe deice system
• Continuous flow of ___ bleed air is routed through the deice precoolers to reduce the temperature of both LP (___) and HP bleed air before it goes to the deice system
• ___ bleed air is vented overboard once it passes through the deice precoolers
• ___ is always running for use of the de-ice system (boots)
BAS Abnormal Operations
Bleed Air Overtemperature
• An over temperature switch is installed in the bleed supply duct ___ to monitor the temperature of the bleed air just prior to the ___
• If it senses that the bleed air temperature is too high, it signals the ECU to close the ___ until the temperature returns to normal
• ___ Caution light illuminates
BAS Abnormal Operations
Nacelle Duct Leak Overtemperature
• Nacelle Duct Leak Overtemperature switches are installed in the bleed air supply duct downstream ___
• System signals ECU to close the ___ and sends a fault code to the Central Diagnostic System to identify the duct leak
• ___ Caution light illuminates
BAS Abnormal Operations
Bleed Overpressure
• Overpressure switch is also installed in the bleed supply duct ___
• If bleed air pressure is too high, it signals the ECU to close the ___
• ___ Caution light illuminates