A vegetated roof May contribute to which of the following credits? A – heat island, non-roof B – storm water quantity control. C – light pollution reduction. D – optimize energy performance. E – Innovation in design.
Stormwater quantity control, optimize energy performance, Innovation in design
Which of the following locations would most likely helo the project team achieve diverse uses?
Pedestrian access to nearby urban business distric. Community Connectivity requires 10 basic services within 1/2 mile of the project. Public Transportation is counted under different credit and therefore does not apply here.
Which team member is most relevant to the Integrated Project Deliver (IPD) process?
Of the team members listed, the architect is most relevant to the integrated project delivery process since he/she is actively involved during the design phase
Which of the following would most likely earn points under the Materials & Resources section? (chose 2)
Materials that are diverted from a landfill and Materials that are recycleable. Materials and resources section awards points for construction waste diversion as well as for rapidly renewable materials. Low VOC materials are covered in the Indoor Enviormental QWuality Section.
Which of the following best represents an example or definition of pre-consumer recycled content? Choose 2
2 and 3, Pre-consumer recycled content, often referred to as post-industrial recycled content (not to be confused with post-consumer recycled content), typically related to material recycled from the manufacturing process.
Increasing ventilation would affect which of the following credit categories? (choose 2)
3,5 Increasing ventilation would obviously have a positive effect on the indoor envioronmental quiality section. however, it might also negatively affect energy performance since more energy is requireed to move air throught the space in a mechanically ventilated building
Which of the statements is true? (choose 2)
The baseline flush rate for water closets is 1.6 Gallons per flush. The baseline flow rate for bathroom faucets is 2.2 Gallons per minitue for private bathrooms and 0.5 GPM for non private bathrooms. So Answer is 1 and 4
What must be recycled on site in order to achieve LEED Certification (Choose 2)
1 and 3. LEED Certification requires an area for storing and collecting recyclables including paper, carboard, glass, plastics and metals
The Solar Reflectance Index SRI is a combination of which of the following
2-Solar reflectance Index, a value between 0-100, meausres the roof ability to reject solar heat. It encompases both emittance and reflectance
The Process of envisioning and describing the desired processes and outcomes of the project at is completion date is referred to as what?
4-Project Vision Statement as defined in the LEEF REference Manual refers to the process of envisioning and describing the desired processes and outcomes of the project at its completion date.
Which represents a benefit of using reused materials? choose 2
Reduction in the demand on new materials and potential cost savings. Reused materials help to reduce the demand on new materials and may also save cost. For example, a tenant that decides to reuse furniture when moving to a new office space can save over 20% of their total construction budget while earning points towards LEED certification.
Which of the following is NOT true regarding LEED online?
1- LEED Online unfortunately does not provide access to case studies or sample documentation from other projects.
In an urban area where the building footprint takes up 98% of the site area, what are most likely the best ways to treat stormwater? (choose 2)
3 and 4. In urban settings, treating stormwater can be difficult since there might be limited vegetation surrounding the building footprint. In these cases, mechanical treatement systems and vegtated roofs can be effetive strategies.
Which costs should be determined at the very begining of a new construction project? (choose 2)
1,3. It is important to evaluate costs at the beginning of a construction project. These cost include “soft costs” such as design and consulting fees. In rare cases, there may be added fees associated with product research. In general unncecessary fees associated with LEED can be kept to a minimun by hiring a highly qualified team and by startting the LEED process very early on the project.
Which of the following is true regarding examplary performance for CFCs?
1- A CFC reduction IS REQUIRED by a prerequisite and therefore does not contribute to points. Prerequisites by nature do not have examplary performace thresholds.
During the integrated project delivery process, which of the following should be identified?
1-One of the first things a LEED Project team should do during the integrated design process is identify the responsible party for each credit
Which of the following is needed to document construction waste management?
3- Waste receipts from the recycling firm and/ or waste collection site are required in order to document the percentage of project waste that was recycled
What are the allowable units for calculating construction waste?
4- Construction waste may be calculated using weight or volume. Weight is much more common in practice
Grean Seal standards relate to which of the following with respect to LEED