What is the general formula for full cost plus pricing
Cost + (markup percentage x cost) = target selling price
What are the steps for Full cost plus pricing
step 1: calculate all variable costs (DM, DL, VMOH, VS&A)
Step2: Calculate fixed cost per unit (FMOH, FS&A)
Step 3: Calculate selling price per unit
VC + FC = total cost + desired ROI = selling price per unit
Step4: calculate markup percentage (desired ROI / Total unit cost - markup percentage
Step 5: total unit cost + (total unit cost x markup%) = target selling price per unit
What is the advantage to Full Cost-Plus pricing
simple to calculate
what is the disadvantage to Full cost-plus pricing
Describe absorption costing
what are the steps for absorption cost-plus pricing
step 1: calculate manufacturing cost per unit (DM, DL, VMOH, FMOH)
Step 2: Desired ROI per unit + S&A exp. per unit = Markup% x manufacturing cost per unit
Step 3: set Target selling price
(Man. cost per unit + (markup% x Man. Cost per unit) = target selling price
What is variable cost plus pricing
includes all VC (variable MOH and VS&A)
- markup must cover fixed Costs and ROI
What are the steps for variable cost plus pricing
Step 1: allocate vC per unit (DM, DL, VMOH, VS&A= total VC per unit Step 2: Calculate markup% (Deisred ROI + (FMO+ S&A) = MP X VC Step3 : VC per unit + (Markup% x VC/Unit) = Target selling price
What are the disadvantages of using Variable cost pricing
for a full cost, absorption cost and variable cost company will reach its ROI ony if what?
only if it reaches its budgeted sales volumne
What are some reasons for using variable cost approach
What is time and material pricing used for
service companies such as professional firms, construction co, repair shops, printers
How is pricing calculated in time and material pricing
use 2 price rates
What is included in labour for time and material
labour includes DL and other employee costs
What is included in Materials for time and material
based on cost of Direct parts and materials used and
- materials loading charge for related overhead costs
what are the steps for time and material pricing
step 1: calculate per hour labour charge
(DL of employees (hourly , salary fringe benefits)
selling and admin and similar OH
allowance for desired ROI/hr of employee time
(rate chosen may be the same for all employees or it may differ depending on the employee’s classification or level)
step 2: calculate a material loading charge