Name the 6 phases of drug development
When is the Critical Time in drug development
It is the point during phase 2 when the Medchem and Supply Route is adjusted to the manufacturing route as the small pilot is transferred to the full pilot. (Most drugs fail during this phase)
Number of patients during the 3 phases of clinical trials
Phase 1: <100 (Healthy)
Phase 2: <500 (With Disease)
Phase 3: <5000
When is scale up risk at its maximum
Between Phase 3 and File & Launch (i.e. when there is a transfer from full pilot to manufacturing)
Time taken to get drug onto market
10 - 15 years
Cost to get a drug on the market
$0.5 - 2 billion
Fraction of drugs to make it onto market
1/10000
Define GMP
Good Manufacturing Practice: Quality Assurance that ensures medicinal products are consistently produced and controlled to the quality standards appropriate for their intended use
Define Fit for Purpose
Why is it important to take records
Define Space-Time Yield
Mass Product/ (Reactor Volume x Reaction Time)
Application of Space-Time-Yield