PM helps control:
Giving real-time info on:
inventory accuracy, unplanned expenses, cash flow
raw material, cost, production status
Features:
How are production orders created?
What links are made?
What links are made when a PO is issued?
Requisitioning from the sales order or inventory list, or adding manually, or from the production order in the case of sub-assemblies.
If they are sent in from sales, they are linked to the sales order by populating the Sales Order number in the component line and the production order number in the Sales detail line.
Information that carries over: Customer number and name Purchase order number Sales order line required date Sales order line reference number Sales order number
Once a requisition has been processed, the PO number is populated on the production order line, and the production order is put on the PO number line. This link is only done by a requisition and cannot be added later.
Company settings:
Enable scrap and yield - If this is turned on there will be fields in the template to enter an estimated scrap and yield. These are then brought into production orders, but the user can edit them for better accuracy. Can be turned off.
Enable revision level - If this is turned on, when a template is edited and saved the user is prompted to enter a revision number. The revision is posted to production history for later reporting.
Default Category - Each line of a template can have a category that is used for later reporting. If the category is always the same, a default entry can be set here so that it is automatically added to each line of the template.
User Settings:
Templates (AKA) Include:
How are they applied?
(Bill of Material/Recipes)
Components, quantities, instructions
Create a Production Order from Templates
Switch from default when editing a Production Order
Production Order Fields:
Phases - A series of phases can be created that the production order can be stepped through. The user clicks the ‘Next Phase’ button and the order is pushed into the next phase and the phase date is updated. The end date/time are then populated on the previous phase so the user can see how long the order spent in each phase.
What are the status’ and how do they work?
Open - Means that the components are not committed in inventory
Pending - The components are committed but production has not started
In-Progress - The components are committed and production has begun
Templates:
Push to Template - If a production order is edited, the template does not get updated unless the user clicks “Push to Template”. This then updates the template that is currently on the production order, and leaves other templates alone.
Pull From Template - If a user pulls from template it brings any changes that were done to the template, except if the lines on the production order were edited, or added to the production order after the initial creation of the order.
Switch Templates - On a production order, the user can switch from the default template to another template. When doing so it will pull the components from this new template, except for lines that have been edited or added to the production order.
If an item has an alternate set for it in inventory the “Switch To Alternate” button will light up and they can click it to change the line to the substitute but must then re-enter the quantity for that component.
Status Level Indicators:
Green - There are enough components for this production order and all other committed orders as well.
Yellow - Indicates that we can build all of this production order, but may not be able to build other production orders that use this component.
Orange - Indicates that we can build all of this production order, but may not be able to build other production orders that use this component. However, the components have already been ordered
Red - There are not enough components to build this order
What does Building a Production Order do?
The user can select the date to post the entry to and can select if they are building the complete quantity or partial. If the user does not wish to complete the remaining quantity they can delete the order and the remaining components will be uncommitted in inventory.