What are 2 especially important factors in selection a client?
What 3 steps should an architect take before signing a contract with a new client?
These steps are necessary in this situation.
What options are available to an architect if the owner’s budget is lower than the architect’s estimated cost but the project would be a good addition to the firm’s portfolio?
What are the architect’s options if the architect’s fee exceeds the amount budgeted by the owner?
A few other “red flags” or things to consider before selecting a client:
Reducing the profit margin and limiting the scope of the work or the project might be responses to this situation.
In this case, the architect can propose to reduce the scope of the project or the scope of his or her services.
What should you confirm before accepting a client who has had another architect on the project?
If another architect or design professional has been involved with the project, confirm that there is no formal or informal agreement currently existing between the owner and that other professional.
What does “project delivery method” mean?
The entire sequence of events needed to provide an owner with a complete building, involving:
What are the 7 factors in selecting a project delivery method?
What factor most often determines the design method used to produce a project?
Cost is a frequent factor in determining this process.
What are the 5 main project delivery methods?
What are the the main advantages of design-bid-build? Disadvantages?
Advantages:
Disadvantages:
What is Negotiated Select Team? When is contractor selected and when are contractor terms for contractor determined? What are is advantages?
variation of design-bid-build where contractor is selected early in the design process and contract terms for contractor determined prior to completion of CD set
What are the options for fee structures for design-bid-build?
What is the construction manager as adviser (CMa) method? What are the CM responsibilities?
Owner hires a construction manager (CM) who acts as the owner’s agent (as does the architect) without any financial interest in the project.
What is a disadvantage of using an independent CM? How can it be reduced?
more complicated management structure
by having CM be the contractor
What are the 3 common methods for establishing the total construction cost of a project with CMa?
Which AIA standard agreements should be used for a CMa?
AIA Document B132, Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition
AIA Document A132, Standard Form of Agreement Between Owner and Contractor, Construction Manager as Adviser Edition
AIA Document A232, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition
AOA Document C132, Standard Form of Agreement Between Owner and Construction Manger as Adviser
What are the CA services requirements under AIA Document A232, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition?
architect and CM perform joint CA services for:
What are the advantages of fast-tracking?
With which project delivery method is fast-tracking most commonly used?
The advantages of this delivery method are
reduced time
lower budget
Construction Management (a or c) method
What is construction manager as constructor method?
Construction manager is part of the contracting firm which has a single agreement with the owner covering the construction management services as well as the construction services provided.
The CM-c’s services are split into which 2 phases?
In a CMc method, the architect’s CA role begins when one of three things happen
Control estimate
The sum of the CM’s estimate of the cost of the work + the CM’s fee. It establishes the expected date of substantial completion and includes a list of drawings and specifications etc used by CM in preparation of the control estimate.
What are the 2 common methods for establishing the total construction cost of a project with CMc?
When is the construction cost established?
What standard AIA Documents should be used for CMc?
AIA Document B133, Standard Form of Agreement Between Owner and Architect, Construction Manager as Constructor Edition
AIA Document A133, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work, Plus a Fee with a Guaranteed Maximum Price
or
AIA Document A134, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work, Plus a Fee without a Guaranteed Maximum Price
What is the primary disadvantage or CMc?
CM’s dual role as contractor and as estimator
- cost decisions made early in design process directly affect the CM’s profitability later in construction
What is Design-Build? What is the process to agreement execution?
Who could be the design build entity?
A construction contractor with an independent architect and engineer as consultants
A construction contractor with in-house design services
A construction contractor collaborating with an architect or other design professional through a joint venture or other project-specific legal entity
A real estate developer subcontracting both design and construction services
Architect with an independent contractor and engineer as consultants
- Less common
Any other person or firm legally permitted to do business as a design-builder in the location where the project is located