hard engineering
manmade structure put next to a river to prevent flooding
soft engineering
the use of sustainable or ecological methods to prevent flooding
What do the C,B,A stand for in the CBA structure used for compare river engineering methods
Cost
Benefit
Analysis
2. CBA for dams
But environmental damage, massive impact on local ecosystems and dams could still flood
eroded material is deposited in reservoir and will build up over time reducing carrying capacity
2. CBA for embankments
but due to extreme weather because of climate change this may not be enough
impact on wildlife as you are modifying the environment
2. CBA for channel straightening
but
moving the problem further downstream
more erosion downstream because the water is flowing faster
2. CBA for flood relief channel
2. CBA for river restoration
2. CBA for flood plain zoning
2. CBA for warning systems
2. CBA for afforestation