Collapse considerations at Row Frame building fires
Construction features of Row Frame buildings
Line placement at a fully involved occupied row frame with smoke showing in exp 2 and fire showing in exp 4. Both similar attached buildings
Concerning Row frame buildings if a floor is fully involved from front to rear it is
Advisable to call for an additional engine and ladder above the full 1st alarm
Concerning Row frame buildings if 2 buildings are fully involved we have a
2nd alarm situation
Concerning Row frame buildings if a top floor fire has extended into the cockloft a
2nd alarm must be considered
Concerning Row frame buildings when fire extends beyond 2 buildings
Promptly consider transmitting a 3rd alarm
At a 3rd alarm cockloft fire involving 4 buildings the correct tactics are