What must written terms of appointment cover? (Ethics 58a)
How might you “win” a project?
What might you consider to establish project context?
Geotechnical report
Topographical survey, level survey
Existing underground services, structures
Climate
Heritage report
Asbestos report
Certificate of Title (any easements and covenants) - legal status
Request Land Information Memorandum from the Territorial Authority
District/ city / unitary plan rules applicable to the site
What are the main forms of agreement for services?
What triggers notified Resource Consent? (RMA 1991 Section 95A)
What are the classes of activities in RMA 1991 (Section 87A)?
What items should be included in LIM issued by the TA?
What is PIM?
A Project Information Memorandum (PIM) contains information relevant to the proposed building work or project that is held by the TA. It may be applied for before the building consent (recommended), or the information can be supplied at the same time as a consent.
When would you use the NZIA Small Projects?
One-offs projects when fees are less than $5000
Bulk and Location, Masterplanning, Feasibility Studies, one off Concepts and Expert Witness engagement.
How might you calculate fees?
What is the CCCS?
Conditions of Contract for Consultancy Services
What five aspects are required for a contract to be valid under contract law?
What course of actions should be taken before agreeing to providing services for a project that another registered architect may have previously provided services for?
Ask client’s permission to contact the other architect to discuss:
If in doubt about your ethical position the only possible recommendation is DO NOT GET INVOLVED.
If client refuses then request a written confirmation from him that all legal and ethical issues have been resolved and there is no legal or moral impediment to a new commission or agreement
Ethically what do you need to do before starting work on a project?
What are the purposes and principles of The Building Act?
This Act has the following purposes:
(a) to provide for the regulation of building work, the establishment of a licensing regime for building practitioners, and the setting of performance standards for buildings to ensure that—
(i) people who use buildings can do so safely and without endangering their health; and
(ii) buildings have attributes that contribute appropriately to the health, physical independence, and well-being of the people who use them; and
(iii) people who use a building can escape from the building if it is on fire; and
(iv) buildings are designed, constructed, and able to be used in ways that promote sustainable development:
(b) to promote the accountability of owners, designers, builders, and building consent authorities who have responsibilities for ensuring that building work complies with the building code.
What is ROM and at what design stage is it used?
Rough order of magnitude
- Cost estimate technique
- Used at early design stage (when no design has been done - little to no design info is available) typically pre-feasibility or conceptual stage
- Used to understand if a project is feasible / viable and if the scope is not yet fully defined
- Basis: historical data, industry benchmarks, or general rules of thumb (e.g., cost per square foot or unit)
- Accuracy: ±30% to ±50%, depending on the quality of data and assumptions.
What is Preliminary Estimate and what are the differences from ROM?
What types of estimates exist for design and construction?
Provide an overview of Contingencies in estimate?
Due to unique challenges in New Zealand, such as earthquake-prone zones, geotechnical risks, and climate considerations, contingencies are a critical part of early estimates.
Contingency allowances are higher in early-stage estimates (e.g., 15%-20%) and decrease as design details become more refined.
What type of contract would you recommend to someone planning to build a house in NZ (without professional contract administration)?
If the homeowner is working with a Registered Master Builder or Certified Builder, using their standard contracts (Master Builders or Certified Builders contracts) is the simplest and safest option. If not, the NZS 3902 Residential Building Contract is a good alternative, especially for fixed-price arrangements.
The National Building Contract (NBC) is another viable option for individuals building a house in New Zealand without professional contract administration.
While it is user-friendly, homeowners without contract administration should still exercise caution to avoid misunderstandings about scope or costs.
It does not include guarantees like those offered with Master Builders or Certified Builders contracts (e.g., 10-year warranty schemes).