Because of the operational problems involved in controlling a vertically extending fire, containment on the _______ of ________ must be the main objective.
floor of origin
p 137
Studies reveal that flashover can occur at _____ minutes, and the loss of elevators typically occurs approximately _____ minutes into operation.
10 minutes / 20 minutes
p 137
What is the cause of elevator failure?
runoff water from hoselines entering the elevator shafts and shorting out electrical contacts
p 137
High rise incidents:
If possible, enough resources to handle the incident should be in place at the ______ minute mark.
20 minute
p 137
Serious high-rise fires require a minimum of _______ handlines.
three
p 137
Suggested basic strategic operating guidelines that may be used at a high-rise fire. Listed in order of importance:
p 139
High-rise - Engine Company Operations:
When responders are able to determine the particular section of a floor where the fire is located, they should select the _______ ______ stairwell nearest to the fire area for initial hoseline hookup and attack the fire from the __________ side.
stand pipe / unburned
p 139
High-rise fires - Engine Company:
Responders should push the fire toward the side that has ?
already burned
p 139
High-rise fires - Engine Company:
They should stretch a hoseline from the standpipe outlet in the floor?
below the fire
p 139
High-rise fires - Engine Company:
When two handlines operating from the same stairwell are necessary, the second line should hook up to the outlet on the ?
fire floor
p 139
High-rise fires - Engine Company:
Buildings with two or more standpipe risers increase operational?
capabilities and provide additional security for operating forces and occupants
p 140
High-rise fires - Engine Company:
Care must be taken to prevent a dueling handline scenario where each crew is ?
working against each other
p 140
High-rise fires - Engine Company:
Operating lines must never?
oppose each other
p 140
High-rise fires - Engine Company:
A good rule of thumb is to have a separate engine supply the standpipe system for ?
each handline in operation
p 140
High-rise fires - Engine Company:
Engine companies can also be used to set up _______, _________, __________ or __________ ___________.
Base, Lobby, Staging or Ground Support
p 140
High-rise fires - Truck Company:
Assignments:
* Determine the number of ____________ serving the fire floor and the floor above.
stairways
p 140
Extinguishing high-rise fiefs requires aggressive responders advancing _____ inch to _____ inch handlines.
1 3/4 inch to 2 1/2 inch
p 137
High-rise fires - Truck Company Assignments:
p 140-141
High-rise fires - Truck Company Operations:
p 141
High-rise fires - Truck Company Operations:
p 141
High-rise fires - Truck Operations
p 141
High-rise fires - Truck Operations
p 141
High-rise fires - Truck Operations:
p 141
High-rise fires - Truck Operations:
p 141